Baildon Moor

Cutting Bracken - August 2008
Cutting Bracken - Aug 2008

We have concentrated on an area that had underlying moorland plants - heathers, sheep sorrel, heath bedstraw, bilberry and crowberry.

The control measures have involved cutting the bracken three times a year.

The results have been very encouraging and we continue to expand the areas we are managing.

Geolocation

53.862119, -1.784162

Conservation Work

Baildon Moor – Bracken Cutting

we park on top of Baildon Moor

A blustery but dry day on the moor. The Glorious 12th spent as it should be - helping manage the moor to enable a range of plants and animals to thrive. 

 

We had the auto-scythe in action for the morning (until the bolts holding the cutting bar to the motor sheared off…! Luckily it’s now gone for some tlc with the Countryside Service) and cut a good swathe of the denser bracken. There was a lot of raking and pile forming to be done. We used hand tools for further cutting, and will return in three weeks for our final visit. 

Moor photos here

Baildon Moor

Today was our first visit of 2016 to cut the bracken in order to help a diversity of moorland flora thrive. The weather wasn’t great – we got pretty wet. We focused our attentions on the steeper slopes and some of the less dense patches using scythes and sickles. 

Some images are in the gallery 

Baildon Moor

we park at the top car park on the Eldwick road

This was, sadly, our last visit for this year.  We had an excellent session clearing a large area of bracken (using well known size comparison jargon, perhaps not quite the size of Wales, but at least the size of several football pitches for their currently highly ranked national team…). 

The auto-scythe was used ably by Ali and Glenford to cut the areas that are still dense with bracken fronds. It was quite a task to keep up with the machine to rake away the cuttings. The hand tools, scythes, slashers and sickles, are more sensitive in areas that have a greater abundance of heather and bilberry regenerating. 

There were a few skylarks around but today we did not catch sight of the Red Kites. However we were able to watch planes taxiing at the airport, a sign that the expected rain held off and we had a lovely afternoon. 

The most disappointing element of this year’s work has been the lack of an ice cream van on any occasion! We hope normal service will return next year.

 

Baildon Moor

meet at the top car park on the Eldwick road

We had another productive day on the moor clearing areas of bracken. We were using both hand tools, scythes and sickles, and the autoscythe in a denser area. Thanks to Ali’s keen eye spotting a loose were we able to cut a large swathe, the challenge being to rake and clear the arisings. 

We have one more visit this year on 4th September. 

Baildon Moor

meeting at top car park

This was our first visit to the moor this year as we embarked on our fourteenth (!) year for bracken control. As usual with our first visit, we returned to some of the patches we have cut before. We like to concentrate on some of the sparser areas so there is no risk of disturbing nesting birds. Our next visit is on 21st August so all nests will be complete by then.

We were pleased will be able show Dave Key form Natural England and John from the golf course our approach and our achievements.

There were plenty of Ringlet and Meadow Brown butterflies and several Small Heath. We found an Oak Eggar moth caterpillar and a large frog. The grouse, oyster catchers and meadow pipits were our audio backdrop, but I don’t recall seeing or hearing swifts and swallows which is unusual.

Baildon Moor Bracken Cutting

Baildon Moor

This was our final cut of the year and we managed to cover a good area with both the auto scythe and the hand tools. We cut the larger bracken at the top of the hill, and worked down the slope to connect the patches of heather and bilberry to the open area at the bottom.

There were plenty of small heath butterflies about, as well as bumblebees, grouse and swifts.

10 volunteers

Baildon Moor

meet top car park.

Today with Cumulonimbus clouds filling the skies, we continued the summer maintenance on Baildon Moor. Using scythes, sickles and the mighty auto-scythe we began to cut back the Bracken. Similar to our last encounter we split into groups and began to work on different area on the moorland. Thankfully the group remained dry throughout the day and we managed to cut a large area of bracken. The group also saw 7 grouse and two voles during the task.

 

We will be returning for our final visit on the 5th September to complete this year management.

 

Today we had a group of 8

 

Click Here to view the rest of the day pictures

Click Here to view the BEES Flickr page

Baildon Moor

meeting at 'top' car park.

This was our first visit of the year to Baildon Moor to begin the fun task of cutting bracken to encourage more moorland plant species. When we set off it was a glorious day with the sun blazing, and we arrive ready and able to do battle with the bracken.

Once we hiked to the site we set off to work, making sure that each person was well away from another for safety reasons. 3 members took to scything the bracken whilst the rest used the sickles to clear the smaller patches.

After lunch a massive operation was taken to rake up the cut bracken and pile together. This also allowed us to make bracken parasols which gave some much needed shade as we carried the bracken to each pile.We will be returning later in the summer to continue the work.

Today we had a group of 8

 

Click Here to view the rest of the day pictures

Click here to veiw the BEES Flickr page

Friday 16th July: Baildon Moor.

area of cleared bracken allowing grass to recolonisearea of cleared bracken allowing grass to recoloniseThis was our first visit of the year to Baildon Moor and as we arrived the moor promised do do what it does best. Weather!. However it turned out not too bad - very windy but not too wet. (on our Wednesday Wildlife Wander we were greeted by thunder, lightning and a soaking downpour).

We are working in the same area of moor with have managed for a decade - on the slope facing towards Sconce - but we are now focusing our extension work down hill rather than back towards the road. We will work in this direction to join the existing heather patches near the fairway. The gradient is too steep for the auto-scythe, which concentrated on the upper areas, so scythes and sickles were the main tools used, raking the arisings into large piles. Friends of Baildon moor used a strimmer to increase the impact of the work.

Swifts, oystercatchers, skylarks and pipits were present through the day, and a nest (probably swallow) was spotted in the shelter. The ling is just coming into flower and the first few bilberries were ripening.

Friday 2nd Sept: Baildon Moor, Top Car Park, Bingley Road, Baildon

Cutting BrackenCutting Bracken

A group of seventeen worked on the moor today, including 14 volunteers. This was our final visit of the year and we had a very successful day working effectively with the auto scythe and hand scythes and sickles. The cut bracken was raked and piled - as well as removing it so it does not prevent regeneration of moorland species, we hope the piles will make compost and they also act as markers of the extent of our work.

The impact that the bracken control BEES have undertaken is considerable and encouraging - the hillside now has good patches of bilberry, heather, crowberry as well as sheep's sorrel and heath bedstraw. We identified areas that we plan to work on next year and identified the need to instigate more monitoring areas. We have noticed that young heather plants are appearing amongst the grass which is to be expected as this is the natural succession of the moorland, but it would be good to monitor the speed and spread of the heather regeneration.

As well as enjoying the work we were able to enjoy the presence of bees in the heather, swallows feeding over the hillside and a covey of partridges numbering 13 or 14, disturbed from their roost in the bilberry.