Sydenham Place

Undercliffe

We made good progress today. We extended the path through the trees; constructing a step and levelling the ground before securing weed suppressant membrane and covering it with bark chippings. 

We cleared vegetation from the path edges and around the bench and cut up and staked the branches that had been removed to create a clearing for the path. There is another apple tree to be planted, and as the allocated spot was on a slope, a terrace wall was constructed to reduce the gradient. It will double up as a bench. 

There are a few pictures in the gallery