Lower Fields Primary School

Fenby Avenue BD4

dismantling the old bridgedismantling the old bridgeWe did well today, perhaps it helps to be serenaded by frogs while you work.

An interesting task today. We hadn’t been on a dam building course, but did our best beaver impressions using the willow we had felled earlier in the year. The idea had been to build some dams, scoop out the water between so the bridge work did not interfere with the pond life, and could be done in relative dry. Well, the frogs were in full spawning mode, singing loudly a meter away. And did I really think we could make an effective dam?! What we have achieved is some structures that can be covered with plastic or pond liner when we come to do the work in May. And we had fun!

Meanwhile we sawed, pushed, swung a sledge hammer, unscrewed, levered various nails, staples and screws and generally successfully removed the old bridge. And yes, it was rotten and definitely needed replacing. Some of the stumps remain in place – they may be left as they are doing no harm, or we may try and dig them out, but it will take a lot of effort I think. The old bridge will become a habitat pile once all the nails and screws are removed. 

The new bridge will be made of plastic wood, and we hope to install it in May.